Hella tunnel, 140 metres long |
Key to Hella’s R&D efforts are the ability to reproduce simulation results in 3D, as a real projection in the tunnel or on the road. It’s done with high-power beamers (30 kLm, 150 kcd) in a viewing area of H ±15° and V ±10°, with an electrical power of 3 kW.